Deutsch   English  
Search Elabo  

News + Fairs
Archive
08/09/04

New, mobile safety and functional test system supplied.

 

If the item to be tested is too large for the test laboratory, then the test laboratory will simply have to go to the item to be tested. A successful combination of systems from two of Elabo's business divisions has now been delivered to the end customer.

Neues, mobiles Sicherheits- und Funktionstestsystem ausgeliefert.

The testing systems division has configured a safety and functional testing system for a well-known manufacturer of multiple-coordinate measuring machines, based on Elabo's TaMo mobile component rack system.

 

For safety testing, the 91-3J compact tester and the 90-2M leakage current device were selected from the standard equipment range and modified to meet the customer's requirements. As a result the following safety tests can be carried out on the CNC measuring machines.

 

Earth conductor resistance measurement:

 

Test current: 10 - 25 A

Test voltage: < 12 V / AC

Measuring range: 0 - 300 mOhm

 

Insulation resistance measurement:

 

Test voltage: 500 V / DC

Measuring range: 0 - 10 / 35 MOhm

 

High voltage test:

 

Test voltage: 0 - 5000 V / AC

Test current: 0 - 100 mA

Test duration: 1 - 99 seconds

 

Leakage current measurement:

Test voltage: 100 - 275 V

Measuring range: 1mA / 10mA

Voltage circuit: In compliance with EN 61010

 

As a special feature, an integrated 1650VA AC power source makes it possible to conduct a functional test by applying a voltage of between 100 and 275 V AC. A two-handed operating system has also been implemented in the testing system for the safety of the operator.

 

Perfectly integrated in the TaMo mobile component rack.

 

A TaMo back M-Frame from the TaMo modular system was chosen for this testing system. With a clearance width of 520 mm, this basic carrier system is ideally suited to take 19" slot-in units.

The wide, vertical utility ducts are provided with opening covers so that integrated multiple sockets, cables and leads can be easily accessed. External test probes and connector sockets can be led out without any difficulty through the brush strips fitted as standard on the inside of the utility duct.

The track wideners on the rear of the M-Frame guarantee a high level of safety, even with this heavy mobile testing unit.

 

 

Source: elabo GmbH

Author: Christian H. Bunke / Hermann Würth

News
09/16/04

TaMo as 19" laboratory rack

read more ...
09/15/04

Test station for fully automatic test sequence

read more ...
08/26/04

Endurance Test System supplied to the customer

read more ...
08/25/04

Test station provides fully automated test process

read more ...
08/09/04

New, mobile safety and functional test system supplied.

read more ...
08/09/04

Seven at a stroke

read more ...
08/02/04

New in the download zone: The new Elabo equipment order catalogue for chairs for training places

read more ...
07/21/04

Technical furnishings for training places

read more ...
07/20/04

Changes in management

read more ...
07/06/04

Another excellent review from the Siemens corporation.

read more ...
07/06/04

Now available in the download area: The new Elabo TaMo product catalogue

read more ...
03/17/04

Hanover industries fair with Interkama from 19 - 24 April 2004 !

read more ...
02/03/04

New high-voltage device family SHV 80 / AHV80 with fully electronic high-voltage source.

read more ...
01/26/04

ELABO supports young people

read more ...
01/21/04

Workplace in motion

read more ...